UWF Logo

Research and Sponsored Programs

 

UWF Home  |  RSP Home

 

Project Directors Manual
Research and Sponsored Programs

 

Table of Contents
Search the Manual
Report Errors
Recommend Improvements
Index and Acronyms List
Changes and Updates
 


 

 

 

 

Section 6. Pre-Award and Proposal Processing

Sponsored Project Approval Internal Routing Form (IRF)

Before a proposal can be processed by Research and Sponsored Programs (RSP), submitted to a funding agency, or accepted as an award, the principal investigator (PI) must obtain the required endorsement of the department chair or center/institute director, dean or vice president (if necessary) on the UWF Internal Routing Form (IRF) and forward to RSP. The IRF and supplemental forms for additional approvals or reviews are located in Appendix B Proposal Processing Menu of this Manual. This appendix provides quick access to the IRF and other forms or references which may apply to a proposed project and is provided so that the PI can look in one location to select documents that may be required for processing. The Menu also provides a feature which allows the PI to upload proposal documents and transmit an electronic copy directly to RSP in advance of the submitted hard copies with the required approval signatures.

This IRF must be filled out for each project or modification of a project and should be routed with the entire proposal through the proper University channels. When routing a proposal that involves participation by more than one department, unit, or college, signatures from respective officials in the collaborating department(s) or college(s) must be included on the IRF at the level of investigator, chair/director, and dean/vice president (if necessary). Proposals submitted through a University Institute/Center require the additional signatures of the institute/center director and the appropriate dean or vice president.

Prior to routing the proposal for signatures, the faculty member should use the checklist in the bottom section of the menu to make sure the proposal is complete in all respects.

The people or offices involved in the internal review and processing of the proposal are as follows:

  • PI is responsible for the budget, technical content, quality and preparation of the proposal and for determining when supplemental conditions such as additional resources, IRB, Animal Subjects, Conflict of Interest, Export Control, or Proprietary Information are applicable.
  • Department Chair or Center/Institute Director is responsible for certifying to the academic soundness of the project, the compatibility of the project with the PI's other commitments, approval of release time, the availability of space and facilities, cost-sharing commitments, assuring that the project is in keeping with department objectives, and concurring that the proposal should be submitted to the agency named.
  • Dean of the College or Vice President of a Division is responsible for determining the appropriateness of the project within College/Division programs, and that resources will be available.
  • RSP is responsible for ensuring compliance with applicable laws and regulations, and University administrative rules. Concurrently problems of institutional financing, cost sharing, prior acceptance of contractual terms and budget matters may be resolved here. RSP is also responsible for ensuring that the content meets with acceptable rules and standards of the University, and for reviewing matters involving human participants, DNA research, hazardous substances, export control review, and the experimental use of animals. Academic policy issues that may arise are resolved here.

The IRF is submitted, along with the original proposal and other required documents, to RSP’s Pre-award Office, Bldg 11, Room 109. Proposals to all U.S. Department of Health and Human Services (DHHS or PHS) and the National Science Foundation (NSF) require the Disclosure of Significant Financial Conflict of Interest form be submitted along with the proposal and IRF (see Section 4 Policies & Guidelines). Other sponsors may have similar policies and each sponsor’s guidelines should be reviewed to determine if there is a requirement for this certification. The UWF Policy regarding Financial Conflict of Interest and Approval of Outside Activity and the related forms are available on the Academic Affairs Web site.

Preliminary proposals, concept papers, and statements of interest differ from verbal inquiries because they have a developed work statement and a budget broken down into general cost groupings. These submissions also require the IRF prior to submission to the potential sponsor.

RSP Staff Responsibilities

RSP staff review the proposal for fiscal accuracy, compliance with University policies and procedures, agency guidelines, and accuracy and completeness of all required sections. The final step before submission is the endorsement by an authorized institutional official in RSP (UWF Signature Authorization Policy). This authorized institutional signature must be obtained before the proposal is submitted to a sponsor and is required for all projects, regardless of the source of funds (e.g., federal, state, local, private). Additionally, RSP Staff will:

  • Review RFP/RA guidelines and requirements and prepare a checklist for development of proposal;
  • Review proposal text for editing and formatting suggestions;
  • In collaboration with PI, prepare/review budget for allowable cost elements, calculation of direct cost elements based on needs identified for scope of work, preparation of cost estimates' description for budget narratives;
  • Complete all standard forms (boilerplate) such as:
    • Application Cover Page
    • Assurances, Compliances, Certifications and Representations
    • Budget Format Pages
    • Current & Pending Support Information for UWF personnel
    • Supporting documentation such as UWF Financial Reports and Audit Certifications.
    • F&A (Indirect) Cost Approved Rate Agreements
    • Certification of Fringe Benefit Rate Analysis
    • And any other forms related to the University rather than the project proposal.

For more information on assistance available, see Sections 2, 3, or 5 for specific functional areas.

Assurances, Compliances, Certifications, and Representations

To obtain funding from the federal government or other sponsoring agencies, the University will make assurances to the sponsor that it is in compliance with applicable regulations. Each sponsor or program will have its own set of requirements. These assurances, compliances, representations and certifications apply to the institution, not the PI.

The sponsor may require some or all of the following assurances and may have additional agency-specific requirements:

  • The University will comply with all regulations, policies, guidelines and requirements, as they relate to the application, acceptance and use of funds.
  • RSP has legal authority to submit applications for and accept extramural funding.
  • Facilities are properly accredited and authorized.
  • The University is not on the Federal Debarment and Suspension List.
  • The University is an Equal Opportunity, Affirmative Action Employer.
  • Military services are not barred from recruitment at University of West Florida sites.
  • Federal Discrimination Regulations are enforced.
  • Federal Lobbying Regulations are enforced.
  • Federal Regulations Regarding Promoting Objectivity in Research are enforced.
  • Federal Regulations Regarding Research Misconduct are enforced.
  • The University is in compliance with Title VI of the Civil Rights Act.
  • The University is in compliance with Title IX of the Education Amendments.
  • The University is in compliance with Section 504 of the Rehabilitation Act.
  • The University is in compliance with National Occupational Safety and Health Act.
  • The University is in compliance with Drug-Free Workplace Act.

On a project-specific basis, the investigator and/or University must indicate when the following special circumstances apply:

  • Radioactive or Hazardous materials are involved.
  • Genetically engineered organisms are involved.
  • Human anatomical substances are involved.
  • Historical sites are affected.
  • This is a group or collaborative proposal.
  • Proprietary or privileged information will be generated by the project.
  • University (or Project) is in violation of any environmental compliance regulation.
  • Project involves the Export Controlled material/information.
  • Project requires inter-governmental review due to state/local/national security.
  • Lobbying activities have been conducted regarding the proposal.

State (Intergovernmental) Clearinghouse Review

The State of Florida Department of Environmental Protection has established an office as required by Executive Order 12372 to act as the clearinghouse on programs which need coordination with other initiatives planned or ongoing in the state. When a federal program mandates State Clearinghouse Review or State Single Point of Contact Review, the standard budget and technical abstract must be submitted to the State Clearinghouse for comment. Whenever a proposal is submitted which requires the State Clearinghouse Review, a copy of the proposal will automatically be submitted by RSP. Any comments or notification of the satisfaction of the required posting period will be copied to the PI. This is a requirement of award and the federal sponsor may withhold release of funding award until such notification is documented. Faculty should contact DSR's Pre-award Office (850) 474-2825 for assistance.

Checklist for Proposals

The following checklist is intended as a guide to assist in the preparation of a proposal. Before submitting the proposal to RSP, faculty should use this list to assure themselves that all aspects of proposal preparation and processing have been taken into account. This checklist can also be found on the menu of the Appendix B Proposal Processing Menu.

1. Is the proposed project consistent with the objectives of the department, college, and University?

2. Are all costs fully detailed, including allowable F&A costs, fringe benefits, and any cost sharing? Remember that the cost sharing must be validated and guidelines are provided in Section 4 University Policies and Guidelines. Increases for salary, equipment and travel costs for multiple-year projects should be anticipated and included.

3. Does the proposal involve a commitment of University funds beyond the proposed project period? If yes, has the necessary internal funding been secured to meet this commitment? (see the supplemental form on menu of the Appendix B Proposal Processing Menu.

4. If the proposal contains privileged or proprietary data, has that data been properly marked?

5. If the proposal involves the use of human participants, laboratory animals, radioactive or biohazardous materials or recombinant DNA/RNA, was it indicated in the certification/assurances section of the UWF IRF? If so, the supplemental procedures and forms for each applicable item must accompany the request to submit the proposal.

6. If the proposal requires subcontracting or other collaborative activities, has a letter of written concurrence been obtained from the respective institutional official? Have subcontracting costs been included in the budget? Is a separate scope of work and budget included for the anticipated subrecipient award or contract? Supplemental forms are available on menu of the Appendix B Proposal Processing Menu.

7. If this is a graduate training program proposal, has it been coordinated with the appropriate graduate department or college dean? All new degree or certificate programs must be cleared though Academic Affairs.

8. Will the proposal require (1) additional space or renovation/modification of existing space inventory; (2) additional operating or equipment funds (matching); (3) additional IT services beyond what are normally available as part of University basic support; (4) Marine Service Center services, resources, or personnel? If yes, refer to the menu of the Appendix B Proposal Processing Menu for links to the appropriate work descriptions, requests or quotations required prior to acceptance of the project award?

9. Has F&A cost reimbursement been requested at the appropriate rate?

10. Is the applicant eligible to be a PI?

11. Will any activity of the proposal involve Export Controlled material or information? Are any participants (including survey subjects, graduate students, or subrecipient personnel) a “foreign person” as defined in RSP Operating Procedures on Export Control? If yes, refer to the menu of the Appendix B Proposal Processing Menu for links to the appropriate procedures, references, and forms.

12. Do the percent effort and personnel salaries conform to University and agency policies?

13. If graduate assistants are included and the agency policy and guidelines allow it, have funds for tuition waiver been requested as part of the direct costs. If the proposal includes graduate assistants, do the stipend rates and tuition payments comply with University and college policy?

14. Are the required space and facilities available without detriment to departmental activities?

15. Are equipment prices in the budget current, and does it include delivery and installation charges? Departmental endorsement on the IRF confirms that the equipment item is unavailable within the department or college for shared use.

16. For federal budget, have the Circular A-21 Cost Principles for Educational Institutions been taken into consideration in the budget development process?

Tips to Insure a Proper and Timely Submission

  • The deadline box on the IRF must be completed (Item 7) and whether this transmittal date is a postmark by or a receipt by date. If there is no definite deadline, indicate a target date for receipt by, or mailing to, the agency. Do not leave this space blank.
  • Provide a complete mailing address contact name, and phone number for proposals that must be sent FedEx.
  • Submit the proposal to RSP at least three full business days in advance of the sponsor's deadline if duplication and mailing of the proposal is required. The mailing address and deadline should be clearly specified on the IRF (Item 4).
  • Do not staple the original proposal or any supporting documents submitted to RSP. RSP will make the required copies, package for shipment, and ship the proposal.
  • NSF and DHHS proposals must include a signed Disclosure of Significant Financial Conflict of Interest form along with the IRF. For NSF proposals, the PI and Co-PI must sign the Conflict of Interest form while for DHHS proposals, the PI and all key personnel must sign.
  • Do not include cents on budgets. Budgeted items should be rounded to the nearest whole dollar. The Research Project Budget Model will be used as the guideline to determine if the proposal budget is in compliance with University current salary, fringe benefit, MTDC exempt and non-exempt cost elements, applicable F&A rate, and line item (Banner Personnel Costs account codes or G-account codes for other types of expenditures) elements for posting of the budget upon award. This template is available from the menu of the Appendix B Proposal Processing Menu and should be provided electronically with the Proposal Documents from this menu.
  • Permanent equipment under federal guidelines is any item exceeding $1,000 and a two-year useful life. Items of less than $1,000 should be itemized in the “Other'' category. Although sponsor guidelines may indicate the $5,000 as the minimum for equipment, state regulations require that the $1,000 minimum be applied.
  • Due to space limitations, RSP is unable to keep a copy of appendices and reprints submitted with a proposal. Please make sure you keep a copy of this material.
  • If responding to a Request for Proposal (RFP), submit a copy of the RFP guidelines with the proposal or include the URL for this document on IRF in Item 5.
  • Itemize all supplies, materials, computer, and publication costs.  Travel must be justified by per diem, number of trips, place, and purpose. Review the sponsor’s guidelines on whether foreign travel is allowed or, in the case of state sponsors, if in-state restrictions apply.
  • If a project requires Human Research Participants Approval or Animal Approval and the approval has been obtained from the IRB or IACUC, submit a copy of the approval with the proposal.  The title of the proposal must match the title identified on the approval.  Contact the IRB or IACUC for further information. If approvals have not been received at the time of the proposal submission, these must be in place prior to the University accepting the award and should be indicated as application pending.

RSP’s Proposal Submission Procedures

Faculty members are urged to submit proposals well in advance of agency deadlines to avoid peak processing times in the Pre-award Office.  This allows RSP to provide a full compliment of services including budget development assistance, review, signature, duplication, assembling and mailing. PIs should consult their own department and college for internal deadlines.  If the proposal is received after RSP mail or courier pick-ups, the PI will be responsible for arranging to pick up and deliver the package to the appropriate mailing/shipping location.  RSP will provide the necessary mailing labels and packing materials.

All applicants are reminded that the agency deadline must be clearly indicated on the IRF including the date and type of deadline (postmark or receipt). Again, if there is no definite deadline, please give a target date for receipt by, or mailing to, the agency. Do not leave this space blank.

There are numerous peak agency deadlines throughout the year. Please keep in mind that proposals received in advance of these dates will receive precedence over those received at the last possible minute before a deadline.

The UWF RSP has developed a Menu of references, forms, and guidelines related to the submission of a proposal. The PI may use this Menu as a check list to review documents that may be applicable to an individual proposal. The Menu includes a section in which documents may be uploaded for one step transfer to RSP. In cases of offer of a proposal for a purchase order or services agreement or electronic submission, these documents will be accessed by RSP Pre-award staff to prepare offers of service, contracts, or proposals for external submission. PIs may also e-mail attached copies of the completed documents if they prefer. The documents will also be an archive of information on proposals submitted for later retrieval for review, modification or resubmission.

NSF FastLane Proposals

If you are a current or former grantee of the National Science Foundation (NSF), or if you plan to submit a proposal to NSF in the future, you must be registered for NSF's FastLane, which utilizes the internet to facilitate business transactions and exchange of information between NSF and its client community (i.e., researchers, reviewers, research administrators).

Once registered, PIs will use FastLane to submit proposals, final project reports, check the status of their proposal review. University research administrators can authorize proposals for submission to NSF, generate reports on their institution's recent and active awards, recent proposals and status of Final Project Reports. Other enhancements are under development.

The University of West Florida is a registered FastLane institution. If you are a UWF faculty member and would like to be registered for FastLane, please fill out the online form or contact our Pre-award Processing office at (850) 474-2825. The Pre-award Office will enter your initial profile data, authorize you to submit proposals through UWF, and send you a user id and initial password that will allow you to access FastLane. All proposals must be assigned to the sponsored research officers with full approval to view, edit, and submit in order for proposals to be processed. Proposals will not be submitted until the PI or a designated representative has approved the final documents.

Other Electronic Submissions

Other federal sponsors may accept submissions only from the individual who opens or establishes a proposal in the electronic system. UNLESS it is prohibited by agency regulations, this individual will be one of the sponsored research officers or grants specialists in RSP. Once a proposal is opened, the PI or others who are designated by the PI may upload, edit, view, and otherwise enter information in the system as required for electronic submission. Once the proposal is finalized and RSP has received the appropriate IRF and any required supplemental forms, the RSP contact will electronically transmit the proposal to the agency. These submissions may be through a specific agency Web site, such as e-Grants (U.S. Department of Education) or may be through the single access portal, Grants.gov.

Grants.gov allows organizations to electronically find and apply for competitive grant opportunities from all Federal grant-making agencies. Grants.gov is THE single access point for over 900 grant programs offered by the 26 Federal grant-making agencies. In Grants.gov applications are submitted by a registered, authorized University staff member. For UWF, this will be the RSP grants specialist(s) who processes the proposal. The standard forms will be completed on line, specific proposal sections such as abstract, narrative, references, biographical sketches will be uploaded, and the saved document will be downloaded, printed, and provided to the PI for final review and approval prior to submission.

If the agency guidelines require electronic submission by the PI, all documents should be forwarded to RSP for review and final submission should not be processed until an authorized RSP staff member has approved. Copies of all electronic acknowledgements or correspondence should be submitted to RSP as soon as received.

Proposals requiring electronic submission should be finalized with one full working day prior to the submission due date.

"No Review" Process

If the RSP Pre-award office receives a proposal at deadline and is unable to review it in the customary manner, the proposal will be submitted to the agency but designated internally as having been submitted under RSP's "no review" process. RSP will review the proposal in customary manner after the "no review" submission and may request a revised version or may require withdrawal of the proposal. If changes are required in the proposal and the proposal is funded, it will not be accepted until after it has been negotiated and approved by the appropriate department chair and dean.

Multiple Submissions

It may occur that the same research or training project is submitted to different funding agencies, provided each agency permits such action. When an investigator sends one project to two or more funding sources, they may be required to state this fact in the proposal. Should more than one sponsor fund the project, the researcher must take into account that the same project may not receive dual source funding. It is possible to split funding and obtain funds for various aspects or phases of one project from a combined number of sources, with agency approval. Faculty are not allowed to charge or cost share more than 100% time to the sum total of their various projects.

Copying and Mailing

As a service to faculty, RSP’s Pre-award staff provides duplication of grant or contract material at no cost. They will also mail/ship the application packages to the respective funding agency by receipted delivery or overnight courier. If duplication and mailing are required, RSP requests the proposal be in the Proposal Processing office at least three full business days prior to the due date. The mailing or courier address and the deadline for shipment or receipt should be clearly marked on the IRF.

Tracking the Proposal's Progress

Faculty and staff are encouraged to follow the progress of their proposal (i.e., signatures obtained, mailing date, agency document number assignment, contract or award document receipt, etc.) through RSP’s Banner Proposal Maintenance Module (FRAPROP).  Two Banner Knowledgebase documents titled "How Do I Query and View a Proposal Record in Banner?" and "How Do I Query and View a Proposal Budget?" will provide instructions to access and review the records.

Acceptance of an Award

An award to the University from a sponsoring agency is a legal document which obligates the University. An award may be simply in the form of a letter issued by an authorized agent of the sponsor or it may consist of a detailed, lengthy contractual document. In some cases acceptance by the University (and then by the agency) is required before the award is in force, while in other cases no formal acceptance is required. RSP is the office authorized to accept and execute awards on behalf of the UWF. RSP will consult with the PI if the award differs from the submitted proposal, so that the award may be accepted, modified, or rejected. No charges may be incurred against a sponsored project until such time as RSP has received and processed an original award notification from the sponsor, and a grant/fund number has been issued by RSP Post-award Office to the PI.

Only certain administrators have been authorized to offer proposals, issue certifications and assurances for a proposal for the University or accept a contract or award document. This designation is by Presidential Signature Authorization Policy P-04.00-06/01. All documents must be approved for signature by the Office of University Counsel. No other signature is considered to be legally binding upon the University and is subject to withdrawal if received after-the-fact.

On some occasions receipt of the actual award documents authorizing expenditures for a project may be delayed. If a delay will seriously impede the course of the project, it may be possible to obtain permission to initiate expenditures for a short time in advance of actual receipt by UWF of an award document. For this purpose, a Request for Temporary Authorization for Advanced or Post-Award Expenditures should be submitted to RSP Pre-award Office. This form requests the issuance of a grant/fund number and commits the PI, department, college/division to reimburse campus accounts in the event that the expected sponsor authorization is not forthcoming or advanced expenditures are disallowed. RSP will recommend an action to approve or disapprove such a commitment only after the proper authority at the granting agency has assured us of their intent to provide such funding with an anticipated effective date.

In some cases an award may be issued by the agency after a series of negotiations which may involve revisions to the scope of the project and/or to the proposed budget. The RSP is the authorized agent for conducting and approving such revisions, but no changes to a project or a budget are authorized without the express consent of the PIs. Faculty researchers are reminded that the acceptance of a revised scope of work or budget is a judgment that only they can make; it is not a judgment or condition that may be unilaterally imposed by the granting agency. If the agency requires the submission of a revised work plan or budget, this must be prepared by the PI and submitted to the RSP for institutional endorsement and for forwarding to the agency just as if it were a new submission.

Upon receipt of an official award at the RSP, the PI will receive an Award Summary and Budget Form informing the PI of pertinent award information, budget set up and of the grant/fund number established for this project.

Project Administration

PI's Responsibilities

Upon the University’s acceptance of an award for support of a research or training project, the PI assumes primary responsibility for the technical conduct and management of the project to assure that contractual and regulatory conditions are met, and to make certain that the program stays within its budget. Costs associated with a project are expected to be direct charged as described in Section 4 Policies and Guidelines and Section 7 Post-award Administration.
The PI, the Department Chair, and the College Dean are all expected to exercise responsible judgment in the administration of the project, particularly with regard to the terms of the agreement and University policies and procedures. Financial liabilities which result from failure to comply with the grant or contract become the responsibility of the PI and the department and college.

Records

A separate account is established for each project. Each account will bear a unique Banner System grant and fund number assigned by RSP Post-award Office. This information is sent to the PI, Department Chair, Dean of the College, and other administrative personnel through an Award Summary and Budget Form.

The issuance of the account (Banner grant/fund) number for the project and posting of the budget authorizes the PI to charge obligations and expenditures without immediate concern for sponsor payments and cash flow considerations. In reality, sponsoring agencies most often do not pay the University until expenditures are incurred and invoices are submitted to the agency by RSP Post-Award Office. Once the account has been established, the PI may review financial reports on a daily basis showing the status of the account via the Banner Reports queries. The PI is expected to keep sufficient internal records to control expenditures, particularly those budgetary lines which may not be exceeded without special approval.

Budget Revisions

Reallocations within awarded budgets are usually possible, but the sponsoring agencies have different restrictions on deviations from the approved budget. The National Institutes of Health and the National Science Foundation are among the federal agencies that have granted authority to the University for self-management of certain budget deviations. Requests for budgetary reallocations require the use of the University Budget Transfer/Amendment form. PIs uncertain of the budgetary restrictions imposed by any particular sponsor should first consult the award document and any of its inclusions by reference. The PI may also consult the Award Summary and Budget Form issued by RSP for that account or they should consult their department business offices. If Budget Amendment forms are submitted that are deemed to require agency approval, they will be returned to the PI with supporting documentation or a request for agency authorization will be coordinated with the PI by RSP Pre-award staff. When an agency approval for an amendment is required, it usually takes the same period of time as request for a no-cost extension or program change. A 30-60 day period should be planned for the agency response PRIOR to executing the amendment in University accounting records or in committing or authorizing expenditure of funds.

Charges to the Project

The PI is responsible for assuring that all approved expenses in support of a project are properly charged. Charging departmental budgets for sponsored projects is normally not appropriate. Prompt and accurate charging to the correct account will preclude costly department labor and paperwork later to effect cost-transfers (see also Section 4 Policies and Guidelines and Section 7 Post-award Administration) to rectify errors.

Personnel

Personnel assigned to sponsored projects, like all other personnel, must be appointed and compensated in keeping with Federal, State and University personnel rules. Classified staff matters are covered by the Florida Department of Education and UWF Rules, Policies and Procedures available at http://uwf.edu/ohr/policies.cfm. Additional Faculty policies are covered in the Faculty Handbook; available at http://uwf.edu/academic/facultyresources/facultyhandbook/facultyhandbook.cfm or questions may be addressed to the Office of the Provost for Academic Affairs.

Change of Principal Investigator

Occasionally circumstances may warrant the designation of a new temporary or permanent PI. The sponsor must be advised and permission obtained before a new PI may be designated. If the PI finds it necessary to nominate someone, such requests must bear the signed endorsement of the Chair/Director and the Dean/Vice President. If the request is made by the Chair/Director, it must be endorsed by the Dean/Vice President. (If the PI is also the Dean, then the request should bear the endorsement of the next higher authority). Whenever possible, please request such a change 30 days in advance of the requested effective date.

A request to a sponsoring agency for designation of a new PI will normally state the reasons for such change and will include curriculum vita of the PI-designate. Such requests must be submitted to RSP for institutional endorsement, before they are forwarded to the sponsor.

In order to maintain continuity and to ensure that proposal conditions and project management responsibilities are fully endorsed, when a new PI is recommended, a modification of the original IRF form will be prepared including the new information and will be routed through the signature and endorsement steps outlined above. The effective date of the change of PI will be used as the beginning of the month in which the request is received. Unless other arrangements are requested in the request for a change, F&A distributions to the PI will be prorated through effective date of change. The same allocations would apply to departmental and college/division shared earned during a given fiscal year.

Transfer of Contract or Grant to Another Institution

To Another Institution: A PI who is transferring to another institution may request to continue his or her sponsored research projects there. Steps may be initiated to transfer the grant or contract only upon concurrence of the Department Chair, the Dean of the College, Director of Research & Sponsored Programs, Associate Vice President for Research and the Provost for Academic Affairs.

Permission must be obtained from the sponsoring agency for such transfers (transfers are by no means automatically granted by all sponsors); arrangements must proceed through RSP. There may be instances in which the University may elect to retain a project and nominate an alternate PI; this also requires agency approval. In general, awards are made to the institution not a particular investigator and if the prime institution assigns other investigators who meet the sponsoring agency requirements the award may be retained.

Transfer of Contract or Grant from Another Institution

A faculty member coming from another institution who will be appointed to UWF is expected to have a sponsored project for which he is lead PI transferred here, whenever possible. Such transfer requires the home institution's approval in addition to the approval of the sponsoring agency. If the previous institution has personnel or expertise necessary to complete the project, a subcontract will be issued to cover the modified scope of work. Projects which are substantially complete may be exempt from this expectation. However, any work performed by the PI while an employee of UWF is expected to be completed with UWF as a subrecipient to the prime agreement. A new proposal (or the revised original) with new budgetary information must then be processed at UWF through the normal routing and approval cycle, prior to submission to the sponsoring agency.

Reporting

With few exceptions, every sponsored project will require a number of reports during the life of the project and most certainly at its conclusion. Every PI should be prepared to submit a final technical report at the very least. The importance of the submission of such a report on a timely basis cannot be overstated. In a grant or contract arrangement, unlike a gift, the sponsor expects and deserves to be informed of results. Negligence by the PI may substantially impact his or her (and the University's) ability to receive other support from the sponsor; and may also result in a loss of payment to the University for costs already incurred. Such losses could become a liability chargeable to the investigator, department and college.

In addition to the technical report(s), other reports may be required relating to inventions, publications, equipment accountability, fiscal data, and voucher submissions. The latter three are the responsibility of RSP Post-award staff. RSP Pre-award staff will coordinate with the Office of Technology Development for the first two submissions.

References:

Quick Reference Numbers and Information

  • Some sponsoring agencies require the insertion of certain other information such as:

     

    • CFDA Number (to search for the correct CFDA number)
       
    • Grantee or Performing Organization: University of West Florida
       
    • Type of Organization: State Institution of Higher Education
       
    • Address of grantee:
      • Office of Research & Sponsored Programs
        11000 University Parkway
        Pensacola FL 32514-5750
         
      • Authorizing institutional official:
        • Name: Richard S. Podemski, Ph.D.
          Title: Associate Vice President for Research and Dean of Graduate Studies
          Phone: (850) 473-7713
          Fax: (850) 473-7714
          E-mail: rpodemski@uwf.edu

           
    • Business office where checks should be mailed:
      • Cashier’s Office Financial Services
        11000 University Parkway
        Pensacola FL 32514-5750
         
    • Federal cognizant audit agency:
      • DHHS Division of Cost Allocation Mid-Atlantic Field Office
        Cohen Building Rm 1067
        330 Independence Ave SW
        Washington DC 20201
        (202) 401-2808

UWF Numbers and References


Go to Table of Contents

Go to Section 5

Go to Section 7

     

Version 1.5.3 July 3, 2008

Copyright © 2005-2006. University of West Florida.